What Happens Between Order Confirmation and Machine Arrival

A CNC cutting machine is a large export item. The commercial offer should make the machine configuration, Incoterm, packing, documents, payment stages and destination responsibilities clear before the deposit is paid.

  • FOB / CIF quotation by destination
  • Export packing and documents
  • Inspection before shipment
Shilai CNC machines being prepared for export packing

Commercial checklist

Make the quotation comparable

Two machine prices are not comparable if one includes a different table, tool set, voltage, packing or freight term.

ItemWhat should be written down
MachineModel, working area, tooling, vacuum, conveyor and options
ElectricalVoltage, frequency, phase and plug
DocumentsCE certificate copy, manual, packing list and commercial invoice
PackingExport packaging, moisture protection and container loading plan
IncotermFOB, CIF or another agreed term and named port
PaymentDeposit, balance trigger and accepted currency
InspectionVideo, live call or third-party inspection before shipment
SparesBlades, mats, sensors or recommended first-order wear parts

Lead time

Production time is not transit time

A standard machine may be quoted at about 15 days from deposit and a custom configuration at about 30 days. Ocean transit, port handling and destination clearance are separate. Ask for the production date and the estimated arrival window in writing.

The buyer or freight forwarder normally handles import duty, local taxes and destination charges unless the quotation says otherwise.